Applications

minus Airport Runway Repairs

plus BluCem HE80AG

plus Bolt Grouting

plus Concrete Protection

plus Concrete Repair

plus Crack Injection

plus Epoxy Coatings

plus Ground Support

plus Grouting

plus High Early Strength Grouting

plus HV Cable Grouting

plus Settlement Prevention

plus Sewer Repair

plus Soft Eye Reinforcement

plus Soil and Rock Grouting

plus Strata Support

plus Structural Repairs

plus Tunnel Support

plus Underwater Grouting

plus Wharf Repairs

BluCem HE80 Early Strength Cementitious Grout

GENERAL HOLMES DRIVE A380 UPGRADE, SYDNEY

Download PDF
General Holmes Drive tunnels required strengthening prior to the arrival of the new A380 Airbus.

PROJECT COMPLETION: 2006

CLIENT/END USER: ABIGROUP/SACL

APPLICATION

WHERE WE USED BLUCEM HE80

The main Sydney Airport runway crosses a bridge over General Holmes Drive. The bridge was strengthened using precast beams grouted beneath the runway using BluCem HE80 Early Strength Grout.

 

WHY WE USED BLUCEM HE80

The use of BluCem HE80 allowed the precast beams to be placed, grouted and the runway resurfaced during the limited shutdown periods between 11pm – 5am. The grout was pumpable allowing it to flow around the beams and achieved 10MPa in 1 hours.

 

FEATURES

High early strength development

Pumpable

Very low shrinkage

 

BENEFITS

Allowed work to be completed in limited access times

Product could flow and fully encapsulate the precast beams

Runway was trafficable within 1 hour

 

SUMMARY

The properties of the BluCem HE80 allowed the client to meet the tight shut down schedule and technical requirements of the airport with no ongoing operations.