Archive for November, 2015

Priming a location is key before engineering work starts.

Prime with confidence – the BluCem AP10

It is important to select the right primer for the correct civil engineering application. Read on to learn about the BluCem AP10.

Water has hampered efforts on Westfield's new mall.

Leaky roof slows progress on World Trade Centre mall

New York’s World Trade Centre Transportation Hub has been hampered by a leaky roof which as delayed opening of the mall until next year.

Cracked concrete can become a major problem.

Concrete topping to industry-leading standards

The BluCem RF20 is ideal for a number of applications including levelling concrete floors and resurfacing rain damaged slabs.

Civil engineering projects need quality material solutions.

Light weight mortar with knockout potential

The BluCem HB30 product is designed to assist in high quality architectural repair finishes in relation to the reinstatement of reinforced concrete.

Adelaide's new tunnel is closer to construction.

O-Bahn bus tunnel one step closer to construction

The O-Bahn bus track tunnel in Adelaide is another step closer with two local businesses named for the design and building of the project.

Statement of Responsibility    Privacy & Terms

© 2017 Bluey Technologies Pty Ltd. The Bluey name, associated trade marks and logos and the "Bluey” logo are trade marks of Bluey Technologies Pty Ltd.